Hitachi HQT-4180 exam is a challenging certification that requires a deep understanding of Hitachi Vantara storage systems. HQT-4180 exam covers a wide range of topics, including Hitachi Vantara storage architecture, installation, configuration, and administration. Candidates must be able to demonstrate their knowledge of Hitachi Vantara storage systems and their ability to install, configure, and manage them effectively. Hitachi Vantara Qualified Professional - VSP Midrange Family Installation certification is designed to help IT professionals enhance their skills and advance their careers in the storage industry.

 

NEW QUESTION # 11
What are two functions of the LAN Blade in the VSP Midrange family? (Choose two.)

  • A. It provides the LAN connection to the file module.
  • B. It provides the management port connecting to the customer LAN.
  • C. It provides the maintenance port connecting to the MPC.
  • D. It provides the iSCSI connection to the servers.

Answer: A,B


NEW QUESTION # 12
Which three RAID configurations are supported by VSP Midrange systems? (Choose three.)

  • A. 10D + 2P
  • B. 8D + 1P
  • C. 2D + 2D
  • D. 7D + 1P
  • E. 4D + 1P

Answer: A,B,E


NEW QUESTION # 13
Which two VSP systems support attached Drive Box Flash (DBF)? (Choose two.)

  • A. VSP F700
  • B. VSP G900
  • C. VSP E590
  • D. VSP F370

Answer: A,C


NEW QUESTION # 14
You need to replace a broken disk drive on a VSP G700.
What are two prerequisites? (Choose two.)

  • A. The red LED on the drive must be lit.
  • B. The Drive Box where the drive is located must be powered down.
  • C. You must wear a wrist strap for ESD protection.
  • D. You must use the Replace button in the Maintenance Utility before removing the drive.

Answer: C,D


NEW QUESTION # 15
Your customer wants to connect multiple servers to a new port on a VSP G700. The correct topology has already been set for the port.
What should you do next?

  • A. Enable Host Group security.
  • B. Create a Host Group.
  • C. Scan for all WWNs.
  • D. Enable Port Security.

Answer: C


NEW QUESTION # 16
Which two tools are available to configure NTP server settings on a VSP E590 system? (Choose two.)

  • A. HSA Embedded
  • B. Initial Setup Wizard
  • C. Maintenance Utility
  • D. Storage Navigator

Answer: B,C


NEW QUESTION # 17
You need to replace a broken fan in a VSP E1090.
What is the correct procedure?

  • A. Use the Maintenance Utility for stopping the fan, then replace it.
  • B. Remove the broken fan, then replace it.
  • C. Use Storage Navigator for blocking the fan, then replace it.
  • D. Use the MPC for blocking the fan, then replace it.

Answer: B


NEW QUESTION # 18
Which two actions can be performed with Hitachi Ops Center Administrator? (Choose two.)

  • A. Configure the Hitachi Remote Ops Monitor Agent.
  • B. Perform Self-Service Maintenance.
  • C. Manage multiple VSP Midrange storage systems.
  • D. Manage virtual storage machines.

Answer: A,B


NEW QUESTION # 19
One Unix server and one Windows server share the front-end ports CL1-A and CL2-A of a VSP E590 system.
What are two requirements to separate the I/Os of the servers? (Choose two.)

  • A. Two cache partitions must be created on the VSP for the servers.
  • B. The Universal Volume Manager license must be installed.
  • C. Both servers must be registered in two different Host Groups.
  • D. Port security must be enabled on both ports.

Answer: C,D


NEW QUESTION # 20
Which tool is used for the remote monitoring of a VSP N800 system?

  • A. MPC Software
  • B. Hitachi Remote Ops SVP Agent
  • C. Hitachi Performance Monitor
  • D. Hitachi Remote Ops Monitor Agent

Answer: D


NEW QUESTION # 21
A customer wants to upgrade a VSP G700 to 512 GB RAM capacity.
What is the valid CFM configuration?

  • A. two BM35 per controller
  • B. two BM45 per controller
  • C. one BM45 per controller
  • D. two BM35 per system

Answer: B


NEW QUESTION # 22
Which two reconfiguration activities are performed without interrupting host access on a VSP Gx00 system? (Choose two.) Choose 2 answers

  • A. upgrading from G200 to G600
  • B. adding a DKB
  • C. upgrading from G200 to G800
  • D. adding a DB60 drive tray

Answer: B,D


NEW QUESTION # 23
Which tool do you use to install license keys on a VSP G370 system?

  • A. MPC Software
  • B. HSA Embedded
  • C. Maintenance Utility
  • D. Storage Navigator

Answer: C


NEW QUESTION # 24
A customer wants to upgrade their VSP E790 with a SAS Expansion feature.
What are three requirements? (Choose three.)

  • A. Drive Boxes (DBs) with SAS interface have to be added.
  • B. The SAS Expansion license has to be installed.
  • C. In Shared Memory, the Extension1 has to be enabled.
  • D. Slots B of both controllers must be available for DKB installation.
  • E. Two additional Disk Boards (DKBs) have to be installed.

Answer: A,B,E


NEW QUESTION # 25
......


The Hitachi HQT-4180 exam is designed to test the candidate's knowledge of the installation process of the VSP Midrange Family, including the configuration of hardware and software components, as well as the troubleshooting and maintenance of the system. HQT-4180 exam is conducted online and is comprised of multiple-choice questions, with a time limit of 90 minutes.

 