Prepare C-S43-2023 Question Answers Free Update With 100% Exam Passing Guarantee [Q31-Q50]

Share

Prepare C-S43-2023 Question Answers Free Update With 100% Exam Passing Guarantee [2024]

Dumps Real SAP C-S43-2023 Exam Questions [Updated 2024]


SAP C-S43-2023 Exam Syllabus Topics:

TopicDetails
Topic 1
  • Maintenance Processing - Basic Functions: This section evaluates the expertise of maintenance management professionals, focusing on the breakdown maintenance process. Candidates are expected to explain and apply breakdown maintenance techniques using both traditional methods and FIORI-based applications.
Topic 2
  • Maintenance Processing - Advanced Functions: This section assesses candidates' ability to describe and implement corrective maintenance processes using both traditional and FIORI-based applications. It involves understanding how to address and resolve issues that emerge during maintenance activities.
Topic 3
  • Technical Objects: This section assesses the capability of professionals to describe and implement technical asset structures. It emphasizes fundamental concepts and the integration of technical objects with key neighboring applications. Candidates should show their ability to develop and manage technical asset structures and integrate them into broader systems.
Topic 4
  • Organizational Units and Master Data: This section focuses on describing and implementing essential organizational units, particularly their integration into general logistics and accounting systems. Candidates should demonstrate their skills in managing and aligning organizational structures and master data with overall business processes.
Topic 5
  • Preventive Maintenance: This section tests the skills of professionals in preventive maintenance, covering strategies such as task lists, single-cycle maintenance, time-based plans, and performance-based maintenance strategies. for designing and managing preventive maintenance schedules and plans.

 

NEW QUESTION # 31
You want to set up a scenario for regular maintenance. The first event should take place after 1 year; after that, it is a regular cycle of 6 months.
Which parameter do you have to use to map this in the system?

  • A. Maintenance package offset
  • B. Scheduling indicator
  • C. Package hierarchy
  • D. Cycle modification factor

Answer: A

Explanation:
Preventive Maintenance


NEW QUESTION # 32
Which steps support the maintenance technician in the Report and Repair Malfunction app (3 tiles)?
Note: There are 3 correct answers to this question.

  • A. Verify planned and actual costs
  • B. Find malfunction records already created in a list
  • C. Complete the malfunction report
  • D. Assign a production resource tool (PRT) to the operation
  • E. Plan repair work for the responsible work center

Answer: B,C,E

Explanation:
Maintenance Processing - Basic Functions


NEW QUESTION # 33
Which functionalities belong to the current portfolio of SAP Business Objects Business Intelligence? Note:
There are 2 correct answers to this question.

  • A. Plant Maintenance Information Systems (PMIS)
  • B. SAP Lumira
  • C. SAP Crystal Reports
  • D. SAP Quick Viewer

Answer: B,C

Explanation:
SAP BusinessObjects Business Intelligence is a suite of products that provides data reporting, visualization, and sharing capabilities. The current portfolio of SAP BusinessObjects Business Intelligence includes the following functionalities1:
* SAP Crystal Reports: A tool for creating pixel-perfect reports from various data sources, such as relational databases, OLAP cubes, XML files, and SAP applications. SAP Crystal Reports allows users to design, format, and distribute reports in various formats, such as PDF, HTML, Excel, and Word.
* SAP Lumira: A tool for creating interactive data visualizations, such as charts, maps, infographics, and stories. SAP Lumira allows users to explore, analyze, and share data insights using a drag-and-drop interface and a variety of data sources, such as spreadsheets, databases, SAP applications, and SAP HANA.
* SAP BusinessObjects Web Intelligence: A tool for creating ad hoc queries and reports from various data sources, such as relational databases, OLAP cubes, SAP applications, and SAP HANA. SAP BusinessObjects Web Intelligence allows users to access, analyze, and share data insights using a web browser or a mobile device.
* SAP BusinessObjects Analysis: A tool for performing multidimensional data analysis and creating analytical applications from various data sources, such as OLAP cubes, SAP applications, and SAP HANA. SAP BusinessObjects Analysis allows users to slice and dice data, create calculations and formulas, and build interactive dashboards and presentations.
* SAP BusinessObjects Design Studio: A tool for creating professional data visualizations and applications for desktop and mobile devices. SAP BusinessObjects Design Studio allows users to design, develop, and deploy applications using a graphical interface and a scripting language. The applications can be embedded in SAP portals, SAP BusinessObjects BI Launchpad, or SAP Fiori launchpad.
* SAP BusinessObjects Dashboards: A tool for creating interactive dashboards and scorecards from various data sources, such as spreadsheets, databases, SAP applications, and SAP HANA. SAP BusinessObjects Dashboards allows users to visualize key performance indicators, trends, and alerts using a variety of components, such as charts, gauges, maps, and selectors.
Plant Maintenance Information Systems (PMIS) and SAP Quick Viewer are not part of the current portfolio of SAP BusinessObjects Business Intelligence. PMIS is a component of SAP S/4HANA Asset Management that provides standard reports and analysis tools for plant maintenance processes2. SAP Quick Viewer is a tool for creating simple reports from SAP tables and views without any programming3. References: 1: SAP Help Portal, SAP BusinessObjects Business Intelligence Platform - SAP Online Help, Topic: SAP BusinessObjects Business Intelligence suite Features2: SAP Help Portal, SAP S/4HANA Asset Management, Learning Journey: SAP S/4HANA Asset Management, Topic: Plant Maintenance Information System3: SAP Community, SAP Quick Viewer.


NEW QUESTION # 34
What do you have to consider when planning maintenance work that is to be carried out by an external company?

  • A. In the control key assigned to the order operation, the "Service" indicator must always be activated.
  • B. For the maintenance order type, you have to assign the Enhanced Procurement Mode.
  • C. If you assign a control key with indicator "Service" for an external service, you have to enter the actual values via the service entry sheet.
  • D. If you assign a control key for an external order operation, the actual values must always be entered as a goods receipt in the system.

Answer: B,C

Explanation:
When planning maintenance work that is to be carried out by an external company, you have to consider the following aspects:
* If you assign a control key with indicator "Service" for an external service, you have to enter the actual values via the service entry sheet. This is because the service entry sheet is used to record the services performed by the external company and to verify the invoice. The service entry sheet is linked to the purchase order and the maintenance order operation.
* For the maintenance order type, you have to assign the Enhanced Procurement Mode. This is because the Enhanced Procurement Mode enables you to use lean services and enhanced limits for external services. Lean services are intended for the procurement of small or highly specialized services that are carried out by external suppliers as part of an internal or external operation. They can be maintained in the material master as service products. Enhanced limits allow you to define a maximum amount for the external service without specifying the service specifications in advance.
* If you assign a control key for an external order operation, the actual values must always be entered as a goods receipt in the system. This is not true, because the goods receipt is only required for external materials, not for external services. For external services, the service entry sheet is used instead.
* In the control key assigned to the order operation, the "Service" indicator must always be activated.
This is not true, because the "Service" indicator is only required for external services, not for external operations. For external operations, the "External Processing" indicator must be activated instead. References: External Services Management (MM-SRV) | SAP Help Portal, Highlights for Asset Management in SAP S/4HANA 2021 | SAP Blogs.


NEW QUESTION # 35
Which options do you have in SAP S/4HANA Asset Management, Public Cloud Edition? Note: There are 2 correct answers to this question

  • A. You can configure SAP S/4HANA Cloud via the self-service configuration UI.
  • B. You do NOT have access to the SAP S/4HANA back-end system.
  • C. You can configure SAP S/4HANA Cloud via the SAP Asset Intelligence Network
  • D. You have access to the SAP S/4HANA back-end system

Answer: A,B

Explanation:
SAP S/4HANA Asset Management, Public Cloud Edition is a cloud-based solution that offers a simplified and standardized configuration of the system via the self-service configuration UI. You can use this UI to adjust the system settings according to your business needs. You do not have access to the SAP S/4HANA back-end system, as it is managed by SAP. SAP Asset Intelligence Network is a separate cloud-based solution that connects manufacturers, operators, and service providers of physical assets. You can use SAP Asset Intelligence Network to share and exchange asset information, but you cannot use it to configure SAP S
/4HANA Cloud. References:
* SAP S/4HANA Cloud, Public Edition - SAP Learning
* SAP S/4HANA Cloud for Asset Management, Public Edition


NEW QUESTION # 36
You require stock material to carry out maintenance tasks.
What do you have to consider regarding material planning in the maintenance order? Note: There are 2 correct answers to this question.

  • A. For stock material you always need a reservation.
  • B. Material can be assigned at the order header level.
  • C. A goods issue can be entered for planned and unplanned material.
  • D. The pick list for materials can be printed before order release.

Answer: A,C


NEW QUESTION # 37
What do you have to consider when planning maintenance work that is to be carried out by an external company?

  • A. For the maintenance order type, you have to assign the Enhanced Procurement Mode.
  • B. If you assign a control key with indicator "Service" for an external service, you have to enter the actual values via the service entry sheet.
  • C. If you assign a control key for an external order operation, the actual values must always be entered as a goods receipt in the system.
  • D. In the control key assigned to the order operation, the "Service" indicator must always be activated.

Answer: D

Explanation:
Maintenance Processing - Basic Functions


NEW QUESTION # 38
You settle a refurbishment order with the batches (valuation types) having price control standard price. What is the effect? Note. There are 2 correct answers to this question.

  • A. The effective costs are posted to the respective batch (valuation type).
  • B. The goods receipt for the batch refurbished is posted with the value of the moving average price
  • C. The goods receipt for the batch refurbished is posted with the value of the standard price.
  • D. The effective costs are posted as a credit memo to a price difference account

Answer: C,D

Explanation:
When you settle a refurbishment order with the batches (valuation types) having price control standard price, the following effects occur:
* The effective costs are posted as a credit memo to a price difference account. This means that the difference between the actual costs of the refurbishment and the standard price of the batch is recorded as a variance in the accounting document. This ensures that the inventory value of the batch is not affected by the refurbishment costs1
* The goods receipt for the batch refurbished is posted with the value of the standard price. This means that the inventory value of the batch is updated with the predefined price that is maintained in the material master. This ensures that the inventory value of the batch is consistent and stable1 The other options are incorrect because:
* The effective costs are not posted to the respective batch (valuation type). The batch valuation is based on the standard price, not the actual costs of the refurbishment1
* The goods receipt for the batch refurbished is not posted with the value of the moving average price. The moving average price is only used for batches with price control moving average price, not standard price1 References: 1: Settlement Receiver | SAP Help Portal


NEW QUESTION # 39
What is characteristic for a maintenance order with status REL - if you also consider the capabilities of business functions? Note: There are 3 correct answers to this question.

  • A. The planner can change planned costs at the operation level.
  • B. Goods receipts for external services can be entered.
  • C. The controller can determine actual cost surcharges.
  • D. The assignment of the notification to the maintenance order header cannot be deleted.
  • E. The planner can change estimated costs only at the header level.

Answer: A,B,C

Explanation:
Maintenance Processing - Basic Functions


NEW QUESTION # 40
How does the work center influence cost calculation in the maintenance order?
Note: There are 2 correct answers to this question.

  • A. Via cost center assigned to a personnel number
  • B. Via cost center and activity type
  • C. Via activity type and hourly rate
  • D. Via organizational unit and personal hourly rate

Answer: B,C

Explanation:
Organizational Units and Master Data


NEW QUESTION # 41
How do you map a counter replacement in SAP S/4HANA Asset Management?

  • A. Create a new measurement document and assign a valuation code for counter replacement.
  • B. Deactivate the current counter and create a new counter.
  • C. Create a new measurement document marked as a counter replacement.
  • D. Assign a catalogue type for counter replacement to the measuring point category.

Answer: C

Explanation:
Technical Objects


NEW QUESTION # 42
You are analyzing the data transfer of the cost center of a piece of equipment. What are the possible data origins? Note: There are 2 correct answers to this question

  • A. The reference functional location of the superior functional location
  • B. The cost center of the superior equipment
  • C. The individual maintenance of the cost center in the equipment master record
  • D. The cost center of the related maintenance work center

Answer: B,C


NEW QUESTION # 43
What do you need to configure to enable entries in the action log of a piece of equipment?

  • A. Activate the change documents for the equipment reference category.
  • B. Define the corresponding history-related field for the equipment reference category.
  • C. Activate the change documents for the equipment category.
  • D. Define history related fields in the usage period customizing.

Answer: A,D

Explanation:
Technical Objects


NEW QUESTION # 44
You need to create a new functional location. Which actions can you perform with the SAP Fiori app "Create Technical Object"? Note: There are 3 correct answers to this question

  • A. Assign documents
  • B. Assign a subordinate piece of equipment.
  • C. Create a task list for functional location
  • D. Change a reference location.
  • E. Edit classification data and characteristics.

Answer: A,D,E

Explanation:
The SAP Fiori app "Create Technical Object" allows you to create a new functional location and perform the following actions:
* Edit classification data and characteristics. You can assign a class to the functional location and enter values for the characteristics of the class. This helps you to categorize and search for functional locations based on their attributes1
* Assign documents. You can attach documents to the functional location, such as drawings, manuals, or certificates. This helps you to provide additional information and documentation for the functional location1
* Assign a subordinate piece of equipment. You can assign an existing piece of equipment as a subordinate object to the functional location. This helps you to establish a hierarchical structure of technical objects and show the relationship between them1 The SAP Fiori app "Create Technical Object" does not allow you to perform the following actions:
* Create a task list for functional location. You cannot create a task list for the functional location using this app. You need to use a different app, such as "Manage Task Lists", to create and maintain task lists for technical objects2
* Change a reference location. You cannot change the reference location of the functional location using this app. You need to use a different app, such as "Change Functional Location", to modify the reference location of an existing functional location3 References: 1: Create Technical Object | SAP Help Portal 2: [Manage Task Lists | SAP Help Portal] 3:
[Change Functional Location | SAP Help Portal]


NEW QUESTION # 45
What do you have to consider regarding a cross-plant planning scenario?

  • A. It is only possible within the same company code.
  • B. Only a maximum number of five maintenance plants can be assigned to a planning plant.
  • C. Multiple planning plants are assigned to a maintenance plant (m: 1).
  • D. Multiple maintenance plants are assigned to a planning plant (n: 1).

Answer: D

Explanation:
A cross-plant planning scenario is a special planning process that allows you to carry out material requirements planning for various plants centrally. This facilitates the production of a product in another plant and it also guarantees a smooth flow of materials between different plants. In a cross-plant planning scenario, you can assign multiple maintenance plants to a planning plant (n: 1) or multiple planning plants to a maintenance plant (m: 1). This means that you can plan and execute maintenance orders in different plants using a common planning plant or a common maintenance plant. There is no limit on the number of maintenance plants that can be assigned to a planning plant, so answer B is incorrect. A cross-plant planning scenario is also possible across different company codes, as long as the plants belong to the same controlling area. Therefore, answer D is also incorrect. References: Cross-Plant Planning | SAP Help Portal and SAP S
/4HANA Asset Management: Plants from a Maintenance ... - SAP PRESS


NEW QUESTION # 46
Which operations can the responsible person perform after a maintenance order is technically completed?
Note: There are 2 correct answers to this question

  • A. Change the settlement rule
  • B. Change the planned costs
  • C. Update the estimated costs
  • D. Lock or unlock the order

Answer: A,D

Explanation:
After a maintenance order is technically completed, the responsible person can perform the following operations1:
* Lock or unlock the order: This prevents or allows further changes to the order data, such as actual costs, settlement rule, or confirmation data.
* Change the settlement rule: This allows the responsible person to adjust the distribution of costs to the relevant receivers, such as cost centers, assets, or orders.
* Post goods movements: This allows the responsible person to record the consumption or return of materials that were used for the maintenance work.
* Enter measurement documents: This allows the responsible person to record the measurement readings of the technical objects that were maintained.
The responsible person cannot perform the following operations after a maintenance order is technically completed1:
* Update the estimated costs: This is only possible before the order is released or during the execution phase.
* Change the planned costs: This is only possible before the order is released or during the execution phase.
* Change the order type: This is only possible before the order is released.
* Change the order status: This is only possible before the order is technically completed or after it is reversed.
Therefore, the correct answers are A and C. References: 1: Maintenance Order Types | SAP Help Portal


NEW QUESTION # 47
What do you have to consider when setting up phase-based maintenance?

  • A. It can be used with any existing order type.
  • B. It is mandatory for breakdown and Preventive Maintenance.
  • C. It is not possible to configure the nine delivered phases.
  • D. It comes preconfigured when using the relevant Best Practices scope items.

Answer: D

Explanation:
Topic: 5
Organizational Units and Master Data


NEW QUESTION # 48
Which functionalities are available in the SAP Service and Asset Manager (SAP Asset Manager) for a maintenance worker? Note: There are 2 correct answers to this question.

  • A. Confirm time sheets
    * Attach documents
  • B. Change BOM
    * Create a work order on the ESRI map
  • C. Display maps
    * Display and maintain Technical Objects
  • D. Schedule resources
    * Change task list

Answer: A,C

Explanation:
Topic: 3
Preventive Maintenance


NEW QUESTION # 49
Which functions are available in the Resource Scheduling for Maintenance Planners app? Note: There are 2 correct answers to this question.

  • A. Schedule and dispatch maintenance operations by shifts.
  • B. Dispatch maintenance order operations
  • C. Monitor maintenance order operations due in the next 4 weeks
  • D. Print job papers from a maintenance order.

Answer: B,C

Explanation:
The Resource Scheduling for Maintenance Planners app allows you to monitor important KPIs for your work centers, such as utilization, priority of due maintenance orders, and unconfirmed maintenance orders. You can also use filters to show the information that you are interested in. By clicking a card, you can access the Manage Work Center Utilization app, where you can dispatch maintenance order operations to your work centers. You cannot schedule and dispatch maintenance operations by shifts or print job papers from a maintenance order in this app. These functions are available in other apps, such as the Maintenance Scheduling Board app and the Print Job Papers app. References: Resource Scheduling for Maintenance Planners | SAP Help Portal and Resource Scheduling for Maintenance Planners | SAP Blogs


NEW QUESTION # 50
......