
New 2022 C_TPLM30_67 exam questions Welcome to download the newest Free4Dump C_TPLM30_67 PDF dumps (97 Q&As)
P.S. Free 2022 SAP Application Associate C_TPLM30_67 dumps are available on Google Drive shared by Free4Dump
NEW QUESTION 18
Which of the following control characters is available in the edit mask of the structure indicator?
Please choose the correct answer.
Response:
- A. D (numeric characters)
- B. M (alphanumeric characters)
- C. A (alpha characters)
- D. Y (special characters)
Answer: C
NEW QUESTION 19
Which steps must you perform to activate the usage history for equipment? (Choose two)
- A. Activate the usage history for the equipment category.
- B. Define history-related fields for the relevant equipment reference category.
- C. Set the Usage History indicator for the maintenance plant.
- D. Activate the usage history for each piece of equipment in the master record.
Answer: A,B
NEW QUESTION 20
Your customer wants to create a component for maintenance that does not allow physical inventory.
Which material type must you use?
- A. Non-valuated materials (UNBW)
- B. Operating supplies (HIBE)
- C. Maintenance assembly (IBAU)
- D. Spare parts (ERSA)
Answer: C
NEW QUESTION 21
An SC9000 controller was rebooted to test failover and is back online. Do the controllers need to be rebalanced?
- A. Yes; this can be done from the Summary, Storage, or Hardware tab in DSM
- B. Yes; however, the other controller needs to be rebooted first
- C. No; they are automatically rebalanced on the SC9000
- D. No; this is done automatically as part of the reboot process in DSM
Answer: A
NEW QUESTION 22
When a user creates a task list using the Copy function, all the header fields transfer to the new task list, with one exception.
Which field is the exception?
- A. Work Center
- B. Status
- C. Assembly
- D. Usage
Answer: B
NEW QUESTION 23
What is the purpose of the usage list for equipment history?
There are 2 correct answers to this question.
Response:
- A. To document the number of breakdowns for an object
- B. To display changes to history-related fields in an equipment master record
- C. To track where the equipment was installed
- D. To display the list of previous equipment operators
Answer: B,C
NEW QUESTION 24
You are installing a new SC9000. Which procedure should be used to install and configure the system?
- A. Connect through the supplied proprietary serial cable to the serial port
- B. Connect through a null modem cable to the serial port
- C. Connect through the Dell Storage Manager Client
- D. Connect through the iDRAC port
Answer: A
NEW QUESTION 25
Which of the following steps must you perform to customize priorities for a maintenance order?
Please choose the correct answer.
Response:
- A. Assign a priority type to an order type.
- B. Assign a priority type to a technical object master record.
- C. Assign priorities to order types.
- D. Assign priorities to technical object master records.
Answer: A
NEW QUESTION 26
Which of the following steps must you perform to customize priorities for a maintenance order?
- A. Assign a priority type to an order type.
- B. Assign a priority type to a technical object master record.
- C. Assign priorities to order types.
- D. Assign priorities to technical object master records.
Answer: A
NEW QUESTION 27
Which is not the phase of corrective Maintenance
Please choose the correct answer.
Response:
- A. Notification
- B. Base
- C. Control
- D. Planning
Answer: B
NEW QUESTION 28
Which of the following Customizing settings is required to assign a notification to a maintenance order operation?
- A. Maintain indicator for notification data on order header
- B. Assignment of order type to notification type
- C. Assignment of operations to all object list entries active
- D. Create default value profiles for general order data
Answer: C
NEW QUESTION 29
Which task list can have both external and internal number assignment for the task list group number?
Please choose the correct answer.
Response:
- A. Bill of material task list
- B. General task list
- C. Functional location task list
- D. Equipment task list
Answer: B
NEW QUESTION 30
Your customer has several plants.
How do you set up the maintenance organizational structure to implement centralized maintenance planning?
- A. Define a plant and assign it to a company code.
- B. Assign all your work centers to one of your maintenance plants.
- C. Define a planning plant and assign the maintenance plants to this planning plant in Customizing.
- D. Assign all your work centers to one of your central planning plants.
Answer: C
NEW QUESTION 31
Which of the following information can the shift report display? (Choose three)
- A. Planned and actual costs for shifts
- B. Maintenance orders and notifications
- C. Maintenance plans and task lists
- D. Digital signatures for approval of a shift report
- E. Measurement documents and goods movements
Answer: B,D,E
NEW QUESTION 32
Your customer executes deadline monitoring (transaction IP30).
What happens after you insert additional call dates using the manual call function?
Please choose the correct answer.
Response:
- A. The system restarts the maintenance plan.
- B. The system reschedules all previous scheduled call dates.
- C. The system fixes the next scheduled call date.
- D. The system retains the normal scheduled call dates.
Answer: D
NEW QUESTION 33
Your customer wants to subdivide the maintenance organization by production responsibility.
What do you use to designate the contact person for coordination between production and plant maintenance?
Please choose the correct answer.
Response:
- A. Plant section
- B. Production cost center
- C. Controlling area
- D. Work center
Answer: A
NEW QUESTION 34
What do you use to set up a refurbishment order for external refurbishment?
- A. An external operation that contains a control key for refurbishment.
- B. An order type for external refurbishment and an assignment of a material with split valuation.
- C. An external operation that contains a subcontracting indicator and a material item with a material provision indicator activated.
- D. An order type for external refurbishment and a material item with item category External Refurbishment.
Answer: C
NEW QUESTION 35
In a refurbishment order for external processing, where can you find information about the defective part after the goods issue has been posted?
- A. In special stock type B (batch) after the return from the service company and a goods receipt posting
- B. In special stock type O (parts provided to vendor)
- C. In special stock type F (customer order stock)
- D. In special stock type R (refurbishment stock), after the return from the service company and a goods receipt posting
Answer: B
NEW QUESTION 36
What do you use to set up a refurbishment order for external refurbishment?
Please choose the correct answer.
Response:
- A. An order type for external refurbishment and a material item with item category External
Refurbishment. - B. An external operation that contains a control key for refurbishment.
- C. An order type for external refurbishment and an assignment of a material with split valuation.
- D. An external operation that contains a subcontracting indicator and a material item with a material provision indicator activated.
Answer: D
NEW QUESTION 37
You need to set up the iDRAC IP address on an SC Series controller with the following details:
* IP address 192.168.0.160
* subnet mask 255.255.255.0
* gateway 192.168.0.1
Which commands should be used to complete this task?
ifconfig inet set eth0 ip 192.168.0.160
- A. ifconfig inet set eth0 netmask 255.255.255.0
ifconfig inet set eth0 gateway 192.168.0.1
ifconfig inet set eth1 ip 192.168.0.160 - B. platform bmc set netmask 255.255.255.0
platform bmc set gateway 192.168.0.1 - C. controller ipconfig set eth0 netmask 255.255.255.0
controller ipconfig set eth0 gateway 192.168.0.1
platform bmc set ip 192.168.0.160 - D. ifconfig inet set eth1 netmask 255.255.255.0
ifconfig inet set eth1 gateway 192.168.0.1
controller ipconfig set eth0 ip 192.168.0.160
Answer: B
NEW QUESTION 38
What are the prerequisites for installing equipment at a functional location?
There are 2 correct answers to this question.
Response:
- A. A cost center is assigned to the equipment.
- B. The functional location master record allows the installation.
- C. A fixed asset is assigned to the equipment.
- D. The equipment category of the equipment allows the installation.
Answer: B,D
NEW QUESTION 39
In order type Customizing, you can set the default for when the purchase requisition is created to immediately, from release, or never. For which combination must you set the default?
Please choose the correct answer.
Response:
- A. Order type and plant
- B. Order type and material type
- C. Order type and planner group
- D. Order type and responsible work center
Answer: A
NEW QUESTION 40
When you create a refurbishment order, which reference objects can you use? (Choose three)
- A. Material without serial number
- B. Equipment without serial number
- C. Material with serial number
- D. Functional location
- E. Equipment with serial number
Answer: A,C,E
NEW QUESTION 41
In order costing, what is the allocation structure used for?
Please choose the correct answer.
Response:
- A. To provide a structure to summarize postings across cost elements
- B. To determine the cost element for debit to the order and credit from the order
- C. To provide a hierarchy structure for posting costs to the general ledger
- D. To determine the overhead costs that need to be applied to each cost element
Answer: B
NEW QUESTION 42
......
C_TPLM30_67 exam questions from Free4Dump dumps: https://surepass.free4dump.com/C_TPLM30_67-real-dump.html (97 Q&As)