[Apr-2024] MB-335 Exam Dumps Pass with Updated 2024 Microsoft Dynamics 365 Supply Chain Management Functional Consultant Expert
Free MB-335 Exam Dumps to Pass Exam Easily
Microsoft MB-335 exam is designed to test the skills and knowledge of individuals seeking to become certified as a Microsoft Dynamics 365 Supply Chain Management Functional Consultant Expert. Microsoft Dynamics 365 Supply Chain Management Functional Consultant Expert certification is ideal for those who want to demonstrate their expertise in the planning, implementation, and management of Microsoft Dynamics 365 supply chain solutions.
Microsoft MB-335 certification exam is an excellent opportunity for professionals who want to demonstrate their expertise in implementing and configuring supply chain management solutions using Microsoft Dynamics 365. By passing MB-335 exam, candidates can enhance their career prospects and gain recognition as experts in this field. With the right preparation and resources, candidates can successfully pass the exam and achieve their certification goals.
NEW QUESTION # 18
You need to set up the configuration model to price the motorcycles correctly. What should you do?
- A. Set Order type in price model to Sales Order and Pricing method in Version to Attribute based
- B. Set Order type in price model to Sales Quotation and Pricing method in Version to Attribute based.
- C. Set Order type in price model to Sales Quotation and Pricing method in Version to Cost based
- D. Set Order type in price model to Sales Order and Pricing method in Version to Cost based.
Answer: A
NEW QUESTION # 19
You need to meet the needs for the large teakwood furniture order.
What must you configure? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.
Answer:
Explanation:
NEW QUESTION # 20
A company uses Dynamics 365 Supply Cham Management.
Several production orders are in the started status.
An issue with equipment causes a rollback in the production status tor some of the orders.
Some orders must be reset once the equipment is repaired, based on which products were being manufactured.
You need to reset the production orders based on the requirements
Which status should you use for each requirement? To answer, drag the appropriate statuses to the correct requirements. Each status may be used once, more than once, or not at all.
You may need to drag the split bar between panes or scroll to view content.
Answer:
Explanation:
Explanation
A close-up of a white background Description automatically generated
NEW QUESTION # 21
You are building the Bill of materials (BOM) for a new production item. The new item has a subcomponent.
Subproduction orders for the subcomponent must be created when estimating production orders.
You need to configure the BOM line to generate sub production orders.
Which BOM line type should you use?
- A. Pegged supply
- B. Item
- C. Phantom
- D. Vendor
Answer: B
Explanation:
The BOM line type determines how the line is handled during master planning and batch order production1. The Item line type indicates that the item is a material or service that is directly consumed, and that doesn't require further explosion or pegged supply1. When you estimate a production order for an item that has a BOM line with the Item line type, a subproduction order is created for the item2.
The other options are not correct, because they do not generate subproduction orders. The Vendor line type indicates that the item is purchased from a vendor and not produced internally1. The Phantom line type indicates that the item is an intermediate product that is used to simplify the design process and group complex products into engineering modules1. The Pegged supply line type indicates that the item is supplied by another production order or transfer order, and that the supply must be reserved before it can be consumed1.
NEW QUESTION # 22
You need to implement the scheduled Kanban requirements.
Which rules should you use? To answer, drag the appropriate rules to the correct requirements. Each rule may be used once, more than once, or not at all. You may need to drag the spirt bar between panes or scroll to view content.
NOTE: Each correct selection is worth one point.
Answer:
Explanation:
Explanation
A close-up of a document Description automatically generated
NEW QUESTION # 23
A company produces paints and assembles bicycle frames.
You must account for paint drying time before assembly operations can begin.
You need to set up the operation to encompass queue times.
Which two options can you use? Each correct answer presents pad of the solution.
NOTE: Each correct selection is worth one point.
- A. Build capabilities for each resource related to color.
- B. Enter a value in the queue time after field for the painting operation.
- C. Make a resource group for each size and color and assign that group to the operation.
- D. Enter a value in the queue time before field for the assembly operation.
- E. Enter a value in the transit time on the painting operation.
Answer: B,D
Explanation:
Explanation
Queue time is the time that a job waits at a work center before or after the job is processed1. You can use queue time to account for paint drying time before assembly operations can begin. You can specify queue time in minutes, hours, or days on the route operations that are attached to the production order2.
To set up the operation to encompass queue times, you should do the following:
Enter a value in the queue time after field for the painting operation. This value indicates how long the painted bicycle frames must wait at the painting work center before they can be moved to the next operation2. For example, if the paint drying time is 24 hours, you can enter 24 in the queue time after field and select Hours as the unit.
Enter a value in the queue time before field for the assembly operation. This value indicates how long the painted bicycle frames must wait at the assembly work center before they can be processed2. For example, if there is a delay between the arrival of the frames and the start of the assembly, you can enter a value that reflects this delay in the queue time before field and select the appropriate unit.
The other options are not correct, because they do not involve queue times. Building capabilities for each resource related to color would allow you to assign resources based on their color proficiency, but it would not account for paint drying time. Entering a value in the transit time on the painting operation would indicate how long it takes to move the painted bicycle frames from one work center to another, but it would not include the waiting time before or after the movement. Making a resource group for each size and color and assigning that group to the operation would allow you to group resources that have similar characteristics and can be used interchangeably in production, but it would not affect the queue times.
1: Queue times 2: Set up operations scheduling
NEW QUESTION # 24
You use the master planning module for Dynamics 365 Supply Chain Management.
Planned production orders have been created.
Several sales orders are canceled in response to concerns about recent online reviews of a product.
You need to enable the appropriate action message.
Which action message should you enable?
- A. Increase
- B. Derived actions.
- C. Advance
- D. Decrease
- E. Postpone
Answer: D
Explanation:
The action message that you should enable is Decrease. Here is the explanation:
An action message is a system-generated suggestion to change an existing planned, approved, or firmed order. Action messages are generated by the master planning calculation in response to changed requirements1. For example, the ship date or quantity is changed on a sales order after you've already created a purchase order to fulfill the demand for that sales order. In this case, the master planning calculation generates one or more action messages that suggest that you update the purchase order. You decide whether to make the changes that are suggested.
The Decrease action message indicates that production orders, purchase orders, and other receipt transactions should be decreased to prevent excess inventory levels1. This action message is generated when there is less demand for a product than was previously planned. For example, if several sales orders are canceled, the master planning calculation will generate a Decrease action message for the corresponding planned production orders.
To enable the Decrease action message, you must select it on the Coverage groups page for the coverage group or item that you want the message to apply to1. You can also specify a decrease margin, which is the minimum percentage difference between the current quantity and the suggested quantity that will trigger a Decrease action message1.
NEW QUESTION # 25
An automobile manufacturer leases cars to companies for use as company cars.
A car leased to a company breaks down and requires repairs.
You must open a maintenance request and replace the car with an equivalent model until the original car is repaired and returned to the company. When the manufacture' receives and inspects the car, the replacement car can be released to the company.
You need to select the maintenance request components to use.
Which components should you use? To answer, drag the appropriate components to the correct assets. Each component may be used once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content.
Note: Each correct selection is worth one point.
Answer:
Explanation:
Explanation
To select the maintenance request components to use, you should use the following:
The leased car that must be repaired: You should use the component. An inbound asset is an asset that is received from a customer or vendor for maintenance or repair1. You can use the Inbound assets page to create and manage inbound assets in Asset Management2. You can also create a maintenance request for an inbound asset and link it to a work order3.
The replacement car for the leased car: You should use the Outbound asset component. An outbound asset is an asset that is sent to a customer or vendor as a temporary replacement for an asset that is being maintained or repaired1. You can use the Outbound assets page to create and manage outbound assets in Asset Management. You can also link an outbound asset to an inbound asset or a work order.
1: Inbound and outbound assets 2: Inbound assets 3: Create a maintenance request for an inbound asset :
[Outbound assets]
NEW QUESTION # 26
A company overstates on-hand raw materials due to the time it takes to post raw materials as consumed when production orders are processed.
All items used to manufacture finished goods must be consumed when a finished good is reported as finished. You must not change all bill of materials lines to use the option of flushing principal.
You need to ensure that all production orders consume raw materials at Report as finished.
Which four actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.
Answer:
Explanation:
1 - In the Production order status section of Production control, select Start
2 - In the Picking list journal, select Always in the Automatic BOM consumption
3 - In the Production order status section of Production control, select Report as finished
4 - Select Make default for all users
Reference:
https://docs.microsoft.com/en-us/dynamics365/supply-chain/production-control/production-parameters-manufacturing-execution
NEW QUESTION # 27
You need to enable the features and configuration keys for the firepits.
Which two features should you enable? Each answer presents part of the solution.
NOTE: Each correct selection is worth one point
- A. Engineering product variants
- B. Change management for process manufacturing
- C. Production floor execution management
- D. Engineering attributes
- E. Engineering change management
Answer: D,E
NEW QUESTION # 28
A company produces pipe at certain fixed lengths.
The company must be able to schedule cutting machines. You set up the cutting machines as resources. AH cutting resources can produce many of the products. There are some products that require cutting machines that can produce longer lengths of product. Only some of the machines can do this.
You need to configure the resources to account for these different products.
What should you do?
- A. Create a resource for each length.
- B. Create a resource group for each length.
- C. Build capability related to length and assign to the appropriate resources.
- D. Configure the Data/Hour option on the Capacity unit field on the resource.
Answer: C
NEW QUESTION # 29
Note: This question is part of a series of questions that present the same scenario. Each question in the series contains a unique solution that might meet the stated goals. Some question sets might have more than one correct solution, while others might not have a correct solution.
After you answer a question in this section, you will NOT be able to return to it. As a result, these questions will not appear in the review screen.
A manufacturing plant uses Lean processes. You plan to outsource a painting operation to a subcontracting vendor. You create a service item named SP 01 to represent the painting service.
You need to create a subcontracting activity for the painting service.
Solution:
* Create a vendor warehouse for the subcontracting vendor.
* Create a vendor resource and add it to a new work cell for outsource painting.
* Create a production flow transfer activity and specify the vendor warehouse as The target warehouse.
Does the solution meet the goal?
- A. No
- B. Yes
Answer: A
Explanation:
Explanation
The solution does not meet the goal. Here is the explanation:
To create a subcontracting activity for the painting service, you should use the following steps1:
Create a vendor warehouse for the subcontracting vendor. This step is correct, because you need to create a warehouse that is assigned to the vendor account and set it as vendor-managed1. This way, you can track the inventory that is located at the vendor's site.
Create a vendor resource and add it to a new work cell for outsource painting. This step is correct, because you need to create a resource that is assigned to the vendor account and add it to a resource group that represents the subcontracting work cell1. This way, you can assign the subcontracting activity to the vendor resource.
Create a production flow transfer activity and specify the vendor warehouse as the target warehouse. This step is incorrect, because you need to create a production flow process activity, not a transfer activity, for the subcontracting service1. A process activity represents an operation that transforms material into products or semi-finished goods2. A transfer activity represents a movement of material or products from one location to another2. You also need to specify the service item (SP 01) as the product of the process activity, and select the Generate license plate option on the mobile device menu item that is used for reporting as finished1.
NEW QUESTION # 30
You need to address the ignition switch issue.
Which three actions should you perform? Each answer presents part of the solution.
NOTE: Each correct selection is worth one point.
- A. Copy link and products.
- B. Set product readiness to manual,
- C. Define business impact.
- D. Set product readiness to automatic.
- E. Change product lifecycle state.
Answer: B,C,E
Explanation:
Adatum Corporation is a multi-entity corporation located in Seattle, Washington in the United States. The company is a leading producer of specialty cakes and cookies. The company also manufactures specialty chocolates that use ethically sourced ingredients from around the world. The company plans to launch a new product line of organic chocolates later this year.
Adatum plans to implement Dynamics 365 Finance and Dynamics 365 Supply Chain Management to manage financials, inventory, and manufacturing capabilities across the entire organization.
* Manufactured products are stored at the distribution warehouses until they are shipped to customers.
* Individually branded pre-packaged cake and cookie mixes are supplied to specialty cafes and restaurants. The mixes are shipped directly to the cafes and restaurants from the production factories.
* The company maintains a fleet of trucks and also subcontracts shipments between the factories and warehouses to outside vendors.
* The mixes and specialty chocolates are based on standard recipes that use precise ingredient ratios. There are strict rules around ingredient substitutions.
* All mixes use one of three base recipes as their foundation: BaseA, BaseB. and BaseC. Additional ingredients, spices, and flavorings are then added to make the final product.
* BaseA and BaseB are made in large batches and stored until they are used in the other mixes.
* Mixes with BaseA have a shelf life of six months due to the type of flour it uses.
* Specialty chocolates are manufactured only during the holiday season.
* Specialty desserts are offered during the holiday season. This year, customers may specify additional icing colors and cake layers when placing orders. Depending on the popularity of two of the new colors, they may be offered the next year.
* Cocoa oil that is extracted during the production of some of the specialty chocolates is used in the BaseB foundation mix.
* Cleaning and setup of machinery between products has been causing delays in production.
* Prices of raw ingredients such as sugar can fluctuate greatly depending on seasonal and worldwide demand.
* To properly record profitability, ail raw materials use the first in, first out (FIFO) costing method, while finished products are recorded at standard costs.
* Large fluctuations have been occurring at month end in costs reported due to the inability to track production runs that span from month-to-month.
* Leftover flour and sugar from production runs are collected, packaged, and donated to local food banks if the amount is too small to use in other runs.
* To maintain Adatum's certification as a manufacturer of ethically sourced ingredients, the traceability of every ingredient in all products to their source must be tracked.
* All products must be randomly tested for adherence to quality standards for ingredient makeup and weight.
* Similar recipes must be able to be produced in succession to limit machinery cleaning and setup times.
* All costs must be tracked for each production run and be able to be reconciled at the end of the monthly accounting cycle, including any work in process (WIP) costs and donations.
* The organic chocolate line must be set up. The ingredients cannot be mixed with non-organic ingredients in inventory.
* Mixes are generally stored and sold in 16-ounce bags. Some quantities are sold and distributed in 5. 10. and 20-gallon containers to large restaurants.
* Each mix has a single unique item number and is tracked per batch produced.
* Specialty chocolate products must be stored in climate-controlled areas of the warehouse.
* QA TesterA discovers during a random test that the batch of a mix does not contain the necessary amount of IngredientB.
* VendorZ, who transports finished goods from PlantA to Warehouses, is consistently late picking up product.
* OperatorA must consolidate partial mix batch group runs into saleable package quantities.
* UserB must set up the mix items.
* UserC learns that mixes containing BaseA have been stamped with a batch date from the flour vendor and is not being calculated from the mix manufacturing date. The mixes from the past month that might be impacted need to be identified and the calculation needs to be corrected.
* UserD must update the costs of finished goods. Accounting wants labor calculated in WIP based on how much time an individual spends performing the operation, as well as the finished goods to post to a specific different ledger account.
* UserE must set up and maintain the cost of sugar.
* UserF must decrease downtime for the machinery.
* UserG must plan the specialty desserts for the current holiday season.
NEW QUESTION # 31
You are a production manager at a company which produces large batches of coffee and creamers.
After a quality inspection, batch 120008 of your cold brew coffee (item number CB-0001) was found to be too acidic and must be reworked.
You need to add 20 grams of sugar and stir the product for an additional 0.S hours.
What three actions are required on the rework order? Each correct answer presents pan of the solution.
NOTE: Each correct selection is worth one point.
- A. Delete all items from the production formula except for 20 grams of sugar.
- B. Add a route operation for 0.5 run time hours of stirring.
- C. Manually reserve batch 120008 after estimating the batch order.
- D. Delete all route operations except for a half an hour stirring operation.
- E. Add 20 grams of sugar to the production formula.
Answer: B,D,E
Explanation:
The correct answer is B, C, and E. Here is the explanation:
To rework a batch order in Dynamics 365 Supply Chain Management, you need to create a new batch order and set the Rework batch toggle to Yes1. You also need to select the Batch number of the original batch that needs to be reworked1. The new batch order will have only one formula line that represents the original batch, and no route operations1.
To add 20 grams of sugar and stir the product for an additional 0.5 hours, you need to do the following actions on the rework order:
Add 20 grams of sugar to the production formula. You can do this by clicking on the Formula option on the All production orders form and adding a new formula line for sugar with a quantity of 20 grams1. You can also specify the ingredient type for sugar, such as Compensating or Filler2.
Add a route operation for 0.5 run time hours of stirring. You can do this by clicking on the Route option on the All production orders form and adding a new route operation for stirring with a run time of 0.5 hours1. You can also specify the resource or resource group that will perform the stirring operation3.
Delete all route operations except for a half an hour stirring operation. You can do this by clicking on the Route option on the All production orders form and deleting any existing route operations that are not related to stirring1. This way, you can avoid unnecessary steps and costs for the rework order.
NEW QUESTION # 32
Note: This question is part of a series of questions that present the same scenario. Each question in the series contains a unique solution that might meet the stated goals. Some question sets might have more than one correct solution, while others might not have a correct solution.
After you answer a question in this section, you will NOT be able to return to it. As a result, these questions will not appear in the review screen.
A company implements Dynamics 365 Supply Chain Management and configures the system to support process manufacturing.
The company manufactures pain-relieving lotions. Several of the primary ingredients are delivered at different concentrations depending on the ingredient and vendor ingredient A is the primary active ingredient in the lotion. IngredientB is used as a compensating ingredient.
You need to ensure that the system is set up to support the manufacturing process.
Solution: Create a dimension-based product master with variants and use the trade agreements to specify the different pricing.
Does the solution meet the goal?
- A. No
- B. Yes
Answer: A
Explanation:
The solution does not meet the goal. Here is the explanation:
To ensure that the system is set up to support the process manufacturing of pain-relieving lotions, you should use the following steps1:
Create a product master for the lotion and release it to the relevant legal entities. On the Product dimension groups page, select Constraint-based configuration as the configuration technology, and select the configuration dimension. On the Released product details page, select Configurable on the Engineer tab.
Create a constraint-based product configuration model for the lotion and add it as a version to the product master. On the Constraint-based product configuration model details page, add attributes, constraints, subcomponents, BOM lines, and route operations to define the features and structure of the lotion. For example, you can add an attribute for ingredient A and specify its concentration as a value. You can also add constraints to limit the combinations of attribute values that are allowed.
Create a price model for the lotion and link it to the product configuration model. On the Price models page, add price components and specify how they are calculated based on attributes, subcomponents, BOM lines, or route operations. For example, you can add a price component for ingredient A and specify different prices for different concentrations.
Configure products on sales orders, sales quotations, purchase orders, or production orders by using the Product configuration models page. You can select values for attributes and see how they affect the price of the lotion. You can also view the price details and see how each price component contributes to the total price.
The solution in the question is not correct, because it does not involve constraint-based product configuration or price models. Creating a dimension-based product master with variants and using trade agreements to specify different pricing would not allow you to handle different concentrations of ingredients or calculate prices based on attributes.
1: Product configuration overview : Create constraint-based configuration : Price models
NEW QUESTION # 33
You need to resolve the issue for UserG.
What should you do? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.
Answer:
Explanation:
Explanation
A screen shot of a computer Description automatically generated
NEW QUESTION # 34
A bicycle manufacturing company is implementing Dynamics 365 Supply Chain Management.
The warehouse must pick and stage parts other than paint for bicycle assembly. Paint is at the production station.
You need to configure the reservations for production.
What should you configure? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.
Answer:
Explanation:
Explanation
To configure the reservations for production, you should do the following:
Define configuration for paint reservation: You should configure the Item model group for paint. The Item model group determines the inventory policies for an item, such as reservation, tracking, and costing1. You can set the reservation policy for paint to FIFO date-controlled, which means that the inventory reservation is controlled by a sorting date according to the FIFO principle2. You can also set the Backward from ship date option, which means that the inventory reservation is controlled by the last update physical date according to the FIFO rule2.
Define the reservation principle for paint: You should set the reservation principle to Start. This means that inventory is reserved when production starts3. This way, you can ensure that paint is available at the production station when needed
NEW QUESTION # 35
You need to set up the system to calculate the overhead rates automatically for production.
Which four actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.
Answer:
Explanation:
1 - Create cost groups.
2 - Associate cost groups to items and resources.
3 - Create overhead calculation node for materials as sucharge and labor as rate for setup time.
4 - Define the basis for calculation costs as absorption.
NEW QUESTION # 36
You work for a gem wholesaler that sells raw diamonds. Diamonds are purchased and sold in individual boxes but weighed and inventoried in carats.
You are setting up a catch weight item for diamonds. Each box of diamonds must be tracked by its individual container weight.
You need to set up this item as a full visibility catch weight item.
Which two steps must you perform? Each correct answer presents part of the solution.
NOTE: Each correct selection is worth one point.
- A. Assign a Tracking dimension group with batch number as the only active tracking dimension.
- B. Create an inter-class unit of measure conversion between boxes and carats.
- C. Assign the item a Tracking dimension group with active serial number control
- D. Assign it a Serial number group with per qty. defined as 1.
Answer: B,C
Explanation:
A catch weight item is an item that is sold by one unit of measure but is managed in inventory by a different unit of measure1. For example, diamonds are sold by boxes but weighed by carats. A full visibility catch weight item is a catch weight item that requires the weight of each individual container to be tracked2. For example, each box of diamonds must have its own weight recorded.
To set up a catch weight item for diamonds, you must do the following steps2:
Assign the item a Tracking dimension group with active serial number control. This enables the item to be tracked by serial numbers, which represent the individual containers of the item. Each serial number will have its own weight associated with it.
Assign the item a Serial number group with per qty. defined as 1. This ensures that each container of the item has a unique serial number and that only one container can be assigned to a serial number.
Create an inter-class unit of measure conversion between boxes and carats. This defines the relationship between the sales unit and the inventory unit of the item. The conversion factor can be based on a nominal weight or an average weight of the containers.
NEW QUESTION # 37
You need to implement the scheduled Kanban requirements.
Which rules should you use? To answer, drag the appropriate rules to the correct requirements. Each rule may be used once, more than once, or not at all. You may need to drag the spirt bar between panes or scroll to view content.
NOTE: Each correct selection is worth one point.
Answer:
Explanation:
Topic 2, Manufacturing Company
General information
A manufacturing company produces custom configured-to-order motorcycles. The company plans to implement Dynamics 365 Supply Chain Management. The company contains one legal entity located in Missouri where all production and warehousing operations occur.
Customization options
The custom motorcycles have a variety of selections that can be selected in the listed order by the end customer, including the following:
Customization restrictions
The following restrictions on customizations are in place:
* Green color can only be sold with the Legend Trim.
* Orange color can be sold with the Sport or Legend Trim.
* The ML seat must be included in the Legend package.
* The MS seat must be included in the Sport package.
Manufacturing facilities
The company includes the following manufacturing groups: Assembly and Plastic Molding. The Assembly group is responsible for assembling the motorcycles with purchased and manufactured goods. The Plastic Molding group is responsible for manufacture of all plastic parts used in the assembly area.
Motorcycle manufacturing
The parts for the product assembly are picked from the warehouse and staged at the correct workstation by a warehouse operator for each production order.
Plastic manufacturing
Plastic parts are molded using dyes that create multiple parts at once. The parts are machined in the same production process to remove excess plastic and add additional holes for assembly. Excess plastic is recycled back into the feedstock of the same color plastic chips for use in the molding process.
Metal Parts
Raw metal parts are purchased fully machined but without primer or paint. The parts are subcontracted to a vendor for primer and paint based upon the color requirements.
Facility
The company has a single warehouse that supports both the assembly and plastic manufacturing areas. The warehouse consists of three aisles with 15 bins and three shelves. The facility has no Wi-Fi capacity but has hardwired terminal stations throughout the assembly production line.
Transactions are currently completed by office staff. Raw materials transfer must support capacity constraints for paint and primer.
Requirements
The company has a single warehouse that supports both the assembly and plastic manufacturing areas. The warehouse consists of three aisles with 15 bins and three shelves. The facility has no Wi-Fi capacity but has hardwired terminal stations throughout the assembly production line.
Transactions are currently completed by office staff. Raw materials transfer must support capacity constraints for paint and primer.
Sales Order
The company has the following requirements for sales orders:
* During the configuration of a sales order, invalid combinations must be prevented.
* Each configuration must create a unique bill of material (BOM) and Route based on options selected.
* Sales pricing for the sales order must be based upon options selected.
* Due to emissions regulations, the motorcycles cannot be sold to the state of California.
Motorcycle manufacturing
The company has the following requirements for motorcycle manufacturing:
* Schedule labor only at the labor pool level without machines by day
* Produce motorcycles within a scheduled day in any order.
* Record actual production labor with start/stop times.
* Record manager approval of labor entered prior to posting.
* Post actual material consumption after production is finished.
Plastic manufacture
The company has the following requirements for motorcycle manufacturing:
* Schedule both labor and machines.
* Adjust schedules by using a Gantt chart.
* Backflush standard labor by operation.
* Post actual material consumption at the start of production.
* Track and allocate costs to the excess plastic.
* Report multiple molded part numbers during the same production run.
* Determine the correct mold to use on a production order.
* Generate a batch number for each production order.
Metal Parts
The company has the following requirements for metal parts manufacturing:
* Schedule shipments to the vendor for painting.
* Receive painted parts into inventory from the vendor.
* Track vendor inventory levels.
Default
You must configure defaults for manufacturing execution production orders to meet the following requirements:
* Ensure accuracy for production order pick list posting.
* Ensure correct pick list creation.
Issues
NEW QUESTION # 38
......